TOOL-08
Pavers · TOOL-08
Paver base calculator
Size a compacted aggregate base, including an optional edge overbuild, without pretending to be an engineering code check.
Working calculator: every number is computed on this page, in your browser, as you type — no account, no server, no tracking. Prices you enter are examples only; results are planning estimates, not contractor quotes.
Results
Start with a footprint
Enter the paving length and width on the left. The documented example is a 12 ft × 10 ft patio at 4 in base depth.
Project basket
Quantities, stock and prices are saved in this browser only. Edit them below, remove lines you no longer need, or download a CSV for your files. Nothing is sent to a server.
Your basket is empty. Use “Add … to basket” on a calculator result to save a line here.
What it calculates
Adjusted footprint, installed and loose volume, conditional tonnage and rounded supplier units.
How the calculation works
- Original footprint = length × width, in square feet.
- Edge overbuild e applies to both sides of each dimension: adjusted length = L + 2e, adjusted width = W + 2e, adjusted area = (L + 2e) × (W + 2e). The overbuild is never added twice.
- Installed (compacted) volume = adjusted area × depth in inches ÷ 12, in cubic feet. Cubic yards = cubic feet ÷ 27.
- Compaction allowance is a separate, editable planning line: loose after compaction = installed × (1 + compaction %).
- Waste allowance is a separate, editable line applied on top: loose material to order = loose after compaction × (1 + waste %).
- Installed and loose volumes are always reported separately, and compaction is applied only once.
- Base material already on hand is subtracted from the loose requirement, floored at zero.
- Bag and bulk orders round up independently: packages = ceil(need ÷ package size). Leftover = purchased − need. Rounding happens once, at this final step, with a small tolerance.
- Estimated cost = packages × your price + delivery, charged once per placed order. Prices are examples you type in.
- Tonnage is computed only from a density you enter yourself (lb/ft³ or tons/yd³). Without a density, tonnage is “not calculated”, never zero.
Limitations
- Edge overbuild is a planning allowance you control; the calculator does not advise a correct overhang for any project.
- Compaction and waste percentages are planning allowances you control; the calculator does not imply engineering code compliance.
- Base material is planned and sold here by volume first. Weight and tonnage require a density you supply.
- Results are purchasing estimates, not contractor quotes, and costs use only the prices you type in.
Free resource
Download the RES-04 — Paver base & sand planning guide for offline planning, or browse the full resource library.
Related tools
| 12 ft × 10 ft patio at 4 in base depth | 40 ft³ |
| In cubic yards (before compaction) | 1.48148148 yd³ |
| Engineering compliance | Not implied |
Documented example from the project blueprint, verified by automated golden tests. Enter your own dimensions in the live calculator above.